Italmas returning from second water test
Engraved steering wheel facet with Russian rose
Italmas rigging
Italmas helm compass and Garmin controls
Craftsman at helm of Italmas during water test
Custom gourmet kitchen of Italmas
State of the art technology for navigational aid on Italmas
Beautiful interior mahogany finishes on Italmas
Deck construction continues on Italmas
Deck construction detailing
Master craftsman shaping flooring
Initial deck planking being installed on Italmas
Custom hatches being assembled for Italmas
Interior wall framing being installed on Italmas
Helm shaping being installed on Italmas
Windshield framing being installed
Custom fuel tank being welded in metal shop
keel adhered to custom fuel tank for Italmas
Assembly of binnacle for Italmas
Anchor mechanism being tested for Italmas
Stainless steel framing being constructed for Italmas
Progress on Italmas
Construction elements of 75' mast for Italmas
Interior elements of Italmas being assembled
Cabin hatches being installed on Italmas
Italmas interior cabin boards
Elegant, hand crafted, mahogany interior of Italmas
Clean lines of full bath on Italmas
Engine being installed on Italmas
Staging test fit of keel on Italmas
Final color of Italmas
Installing keel on Italmas
Previous Boat
Next Boat
angle-left-whiteangle-leftangle-rightMaskCreated with Sketch. PathCreated with Sketch. closefacebook instagram Menu Blocks IconCreated with Sketch. play Van-Dam-logo-taglineyoutube